Proposed Plan of Mosque
 
 
Proposed big Masjid under Jamiya-Al-Hashimiyya-Al-Islamiya
Makham, Alappuzha-12,  Kerala, India
 
 
  ABSTRACT OF ESTIMATE  

 

ITEM
  NO

 

DESCRIPTION OF ITEMS OF WORK   

 

QTY

 

UNIT

 

RATE /
 UNIT

 

 AMOUNT

 

1.


2.




3.

 

4.
 


5.



 

 

 



6.  


 






7.







 

8.

 

 





9.







10.










11.







12.







13.

 

 

 

 

 

 


14.











15.

 






16.

 

 

 




17.

18.

19,

 

Clearing the Site.


Earth work excavation in ordinary soil to the required depth and width as specified with all leads and lift etc. for footing
 

Supplying and providing P.C.C. 1:5:10 in 15 cm thick


Supplying and casting vibrate R.C.C 1:2:4 using 20mm granite broken stone.


Supplying  and casting vibrate R.C.C. 1:1:5:3 using 20mm granite broken stone for column, beam and roof slab including cost and conveyance of all materials, formwork, steel and its bending watering and curing etc Complete as shown in the detailed drawing.

a)       Ground floor

b)       First floor   



Supplying and providing brick work masonry in c.m 1:6 for super structure including cost of all materials, labour formwork and curing etc. complete.

a) Ground Floor

b) First Floor


Providing 12mm thick plastering in c.m 1:5 on exterior and interior faces of walls including cost of all materials, labour, formwork and curing etc. complete.

a)    Ground floor

b)       First floor


Providing 9mm thick plastering in cm. 1:3 for ceiling of slabs, sunshade & staircase including cost of all materials, labour, formwork and curing etc. complete.

a) Ground Floor

a) First Floor



Supplying and casting 10cm thick flooring with P.C.C. 1:5:10, using 40mm hard granite broken stone including cost and conveyance of all materials, labor charges and curing etc. complete. Ground floor.  



Supplying and providing cement plaster surface with red oxide finish for floor in cm. 1:4 including cost of materials, labor and polishing charge etc. complete.

a) Ground Floor

b) First Floor



supplying and laying good quality glazed tiles for floor of bathrooms.

a) Ground Floor

b) First Floor


Supplying and fixing good quality glazed tiles for floor of bathrooms and Houlu

a) Ground Floor

b) First Floor


Supplying and fixing Doors and windows with good quality Teak wood including all fittings, fixing charges and also polishing the wooden surface to good finish etc. complete.

a) Ground Floor

    Door
   
    Window

b) First Floor

    Door

    Window

 
Supplying and fixing Doors and windows with good quality Teak wood including all fittings, fixing charges and also polishing the wooden surface to good finish etc. complete.

a) Ground Floor

b) First Floor



Supplying and fixing steel grill work in secondary Masjid and pipe room

a) Ground Floor

b) First Floor


Supplying and providing White wash over plastered surface two coats including cost of all materials, labour charges and curing charges etc. complete.

a) Ground Floor

b) First Floor




Plumbing and sanitary fittings

Electrification

Miscellaneous and cost of 3 Minars of Masjid

 




 

                                        Total

 

 

 







100



30.00


73.00

 

 

 


147.00

140.00

 

 



49.00

45.00

 

 


1200.00

900

 

 


1000.00

900.00

 


50.00

 

 





500.00

450.00





80.00

40.00





275.00

50.00

 





 

13.00

300.00


15.00

30.00

 

 



17.00

3.00

 




40.00

25.00

 

 

200.00

1800.00








M3



M3


m3



 

 


m3

m3









m3

m3



 



m2

m2
 


 


m2

M2
 




m3



 



 


m2

m2





m2

m2





m2

m2


 




 

m2

m2
 

m2

m2

 






No.

No.

 



m2

m2

 

 

m2

m2





LS

LS

LS

 

 

 

 

 








150.00



3250.00

13000.00



 




12750.00

13000.00





 



5000.00

5300.00

 




130.00

155.00




 


150.00

175.00




3250.00

 

 






250.00

300.00

 


500.00

575.00






500.00

575.00




 




4500.00

5000.00

5500.00

6000.00








1500.00

1500.00







600.00

700.00

 

 

25.00

35.00




 

 

 


10000.00




15,000.00


97500.00


949000.00



 





1874250.00

1820000.00





 


245000.00

238500.00


 


156000.00

139500.00

 

 


150000.00

157500.00
 




162500.00






 



125000.00

135000.00






40000.00

23000.00






137500.00

28750.00

 

 

 


58500.00

150000.00


82500.00

180000.00








25500.00

4500.00

 




24000.00

17500.00

 

 

50000.00

63000.00

200000.00

300000.00

100000.00


 






7759500.00

Rs.Seventy Seven Lakh Fifty Nine Thousand and Five Hundred only
 
CERTIFICATE
 

This is to certify that the cost of construction of a proposed big Masjid under Jamiya – Al – Hashimmiyya – Al – Islamiyya, Makkam, CivilStation ward, Alappuzha, Kerala,S.India comes to rupees 77,59,500.00 (Rs.Seventy Seven Lakh Fifty Nine Thousand and Five Hundred only). As per plan and estimate are attached herewith . The rates are prevailing at the locality.

 

10.01.2006
Alappuzha

Mr.Aboobacker
(Civil Engineer)
Managing partner